Projects
Projects
Deep Star - TechnipFMC/Houlder (2021)
550t Crane replacement. Short Circuit calculaitons for upgraded switchboards. Site supervision during dry-docking in Remontowa Shipyard. Supervising de-commissiong of old crane. Assisting in installation of the new crane.
Ballast Water Treatment System - Houlder (2020)
Completed electrical engineering scope for BWTS systems for varous shipowners:
Dee Fisher
Dee Speciality
Ben-my-Chree
Boskalis
Sovereign
Sea Victoria - Vale/Houlder (2020-2021)
Completed the detailed design for an air lubrication system installation onboard the Sea Victoria. The vessel is a 325,000 DWT Very Large Ore Carrier (VLOC) which is on long term charter to Vale A.S., the Brasilian mining company.
RoPax - IoMSPC/Houlder (2020-2021)
Battery Hybrid Ferry plan review, ensuring it meets the design specification, as well as advising IoMSPC on technical (electrical engineering) and regulatory aspects, to ensure high quality and timely delievery.
This RoPax vessel due for delievery in 2023, will be contructed by one of the world’s major shipbuilders, Hyundau Mipo Dickyard (HMD), South Korea.
Honfleur (NB774) - FSG/Houlder (2019-2020)
Electrical engineering support to FSG Design Office (Electrical Department). Focused on ships automation, HVAC and safety systems.
Dual fuel (LNG) electrical power plant. Large storage tank being re-fuelled either by bunker stations or by mobile containerized tank units, which are exchanged by ship’s crane.
Deep Orient - Technip (2013)
Scope of work: shipbuilding constructing works supervision, ship’s commissioning and sea-trials, FMECA marine systems (DP).
Skandi Acergy - ACERGY (2011)
Scope of work: TLS pipelay system integration, completion of electrical package for TLS integration.
Seven Atlantic - SUBSEA7 (2009)
Scope of work: site assistance to Diving complex commissioning, review of electrical documentation and FMEA.
Skandi Seven - SUBSEA7 (2008)
Scope of work: design and supervision on back deck supply installation, power supply Module Handling System and OBS ROV
Toisa Proteus - ACERGY (2008)
Scope of work: main switchboard upgrade and design of power supply network for TLS incl.DNV approval, load and short circuit calculations